Refurbishing Offices

The office flooring installation service that cancels out the downtime

The furniture goes up and the carpet goes down
(the non-disruptive carpet tile replacement system)


Replacing office carpet or carpet tiles? Why suffer upheaval and disruption when Project Flooring in Rochester will do the job overnight?  Why pay for storage and lost working hours? 

Our flooring team can start when your staff go home. When they return the next day, everything is as they left it, except the new carpet is now in place.  It's thought that a high percentage of the cost of commercial carpet replacement is due to furniture handling. To get the carpet on the floor, you need to get the furniture off the floor. But our Uplift System at Project Flooring can mitigate that cost.  To enquire, get in touch with our Rochester team today.

The Uplift System


Our Uplift System allows operatives to lift the required equipment so they can easily remove and reclaim the old floor covering and install the new one.

Using the Uplift System provides a cost-effective solution to carpet replacement. For carpet replacement in occupied work environments, our Uplift System is an efficient and economical alternative to dismantling and moving office furniture. In most cases, our Uplift Systems allows us to install new carpet without moving, packing or disconnecting existing data or electrical wires that reside within the furniture system. It is without doubt a simpler, faster and cost-effective way to install new flooring.

Project management


Our management is structured in such a way as to give continuity from inception of a project to completion.  The same members of the team will stay with the project from the bidding through to handover. This provides continuity, gives the client peace of mind and elicits a sense of commitment to the project within our Project Management Team. It results in the efficient and timely procurement of the project to the high standards expected of Project Flooring.

Safety


Whenever necessary, Project Flooring issues method statements, risk assessments and COSHH safety data sheets for the work that's to be carried out. Our operatives are equipped with full PPE when working within a building under construction and are up-to-date with the latest health and safety requirements.

Benefits of our Uplift System


  • No boxing and crating the contents of desks, work surfaces, overhead storage units or vertical storage cabinets
  • No disconnecting or reconnecting of telephones, computers and electrical equipment
  • No dismantling or reassembling of furniture
  • No disruption
  • No co-ordination problems
  • Paper, files, etc will be on the desks where employees left them overnight
  • There is no need to employ IT specialists, electricians or telephone engineers
  • Each morning members of staff will continue to have unimpeded access to communications equipment etc
  • The enormous ‘impact’ cost of employee downtime and loss of productivity is eliminated
  • As no other trades are involved, any programming, complicating or split responsibilities are eliminated

Business doesn't have to stop with our Uplift System


info@project-flooring.co.uk

Contact Us

Share by: